Skip to content
Free shipping above ₹499
Oakspine Press

SBI PO quant revision sheet

The formulas, fraction values and DI habits to read before every mock, each with a one-line reason so you can rebuild it if you forget. Arithmetic, interest, time and work, speed, mixtures, mensuration, P&C and probability, plus a 16-question self-test with answers.

11 Oct 2026 6 min read

In this guide
  1. Fractions and percentages
  2. Profit, loss and discount
  3. Interest
  4. Ratio, averages, partnership and mixtures
  5. Time, work and speed
  6. Mensuration
  7. P&C and probability
  8. DI habits
  9. Self-test: 16 questions in 12 minutes
  10. Last-week checklist

This is the sheet to read in the ten minutes before a mock and in the last week before the exam. It is not a place to learn a topic for the first time; each block links back to a full guide. What it adds is a one-line reason next to the formulas that people most often misremember. If you know why a formula works, you can rebuild it in the exam hall when memory fails.

Use it actively. Cover the right-hand column of each table and say the rule aloud before you look.

Fractions and percentages

FractionPercentFractionPercent
1/333.33%1/911.11%
1/616.67%1/119.09%
1/714.29%1/128.33%
1/812.5%1/156.67%
3/837.5%1/166.25%
5/862.5%7/887.5%
RuleFormulaWhy
Percentage change(new − old) ÷ old × 100Change is measured against where you started
Successive changes a% and b%a + b + ab/100The second change acts on the first change too
A is r% more than BB is r ÷ (100 + r) × 100% less than AThe base switches from B to A
Price up r%, same spendingConsumption must fall by r ÷ (100 + r) × 100%Same logic as the line above
Percentage pointsA plain difference of two percentages20% to 25% is 5 points but a 25% rise

Profit, loss and discount

RuleFormulaWhy
Profit % and loss %On cost priceProfit is judged against what you paid
Discount %On marked priceThe discount is taken off the label
Mark-up m%, discount d%SP = CP × (1 + m/100) × (1 − d/100)Two successive changes
Same SP, profit x% on one and loss x% on the otherNet loss of x²/100 %The loss is on a bigger cost price
Buy x, get y freeDiscount = y ÷ (x + y)You pay for x out of x + y items

Full guide: profit, loss and discount.

Interest

  • SI = P × R × T ÷ 100. CI amount = P × (1 + R/100)ᵀ.
  • CI − SI for 2 years = P × (R/100)². For 3 years = P × (R/100)² × (3 + R/100).
  • Half-yearly: halve the rate, double the periods. Quarterly: rate ÷ 4, periods × 4.
  • Under CI, if a sum doubles in n years, it becomes 4 times in 2n and 8 times in 3n.
  • 10% multipliers: 1.1, 1.21, 1.331, 1.4641.

Full guide: simple and compound interest.

Ratio, averages, partnership and mixtures

RuleFormulaWhy
Joining ratiosA : B = 2 : 3 and B : C = 4 : 5 give 8 : 12 : 15Make B the same in both (12)
AverageSum ÷ countChange the sum, then divide again
PartnershipProfit ratio = capital × timeMoney working for longer earns more
AlligationCheaper : dearer = (dearer − mean) : (mean − cheaper)Each side balances the other's distance from the mean
Repeated replacementPure left = V × (1 − x/V)ⁿEach round keeps the same fraction

Time, work and speed

  • Work: take total work as the LCM of the days; rates add, days do not.
  • Adding three pair-rates counts each person twice.
  • Person-hours are fixed: M₁ × D₁ × H₁ = M₂ × D₂ × H₂ for the same job.
  • km/h × 5/18 = m/s, because 1,000 m ÷ 3,600 s = 5/18.
  • Two equal distances at a and b: average speed = 2ab ÷ (a + b).
  • Same direction subtract speeds; opposite directions add.
  • Train passing a pole: its own length. Passing a platform or another train: the sum of lengths.
  • Boat = (down + up) ÷ 2; stream = (down − up) ÷ 2.

Full guide: time, work, speed and distance.

Mensuration

ShapeArea or volumeSurface
Circleπr²Circumference 2πr
Triangle½ × base × height
Cylinderπr²hCurved 2πrh
Cone⅓πr²hCurved πrl, where l is the slant height
Sphere(4/3)πr³4πr²
Hemisphere(2/3)πr³Total 3πr²

Use π = 22/7 when the radius is a multiple of 7.

P&C and probability

  • Arrange: nPr. Choose: nCr = nPr ÷ r!.
  • Repeated items: n! ÷ (p! × q!). Circle: (n − 1)!.
  • "Together": treat as one block. "Never together": total minus together.
  • P(not A) = 1 − P(A). Independent events multiply.
  • Two dice: 36 outcomes. A pack: 52 cards, 12 face cards, 4 of each rank.

Full guide: probability and P&C.

DI habits

  • Read the headings, units and footnotes before the first question.
  • Weight averages by group size; never average percentages of different bases.
  • "Which is highest?" questions need an order, not values. Compare fractions by cross-multiplying.
  • Divide by the old value for a percentage change.
  • Check whether an answer is asked in lakh, thousand or crore.
  • If a set is slow after two questions, move on and come back.

See calculation shortcuts for speed methods.

Self-test: 16 questions in 12 minutes

  1. Write 3/8 as a percentage.
  2. Price rises 25%. By what percentage must consumption fall to keep spending the same?
  3. Cost ₹800, marked 25% above cost, sold at 10% discount. Profit %?
  4. SI on ₹5,000 at 6% a year for 3 years?
  5. CI on ₹10,000 at 10% a year for 2 years?
  6. A takes 10 days, B 15 days. Together?
  7. 72 km/h in m/s?
  8. A 240 m train passes a pole in 12 seconds. Speed in km/h?
  9. Rice at ₹40 and ₹55 a kg is mixed to cost ₹45 a kg. In what ratio?
  10. A invests ₹6,000 for 12 months and B ₹8,000 for 6 months. Profit ratio?
  11. The average of 6 numbers is 45. One is removed and the average becomes 42. What was removed?
  12. 7C2?
  13. Two dice are thrown. Probability that the sum is 7?
  14. Area of a circle of radius 14 cm?
  15. Volume of a cylinder with radius 7 cm and height 10 cm?
  16. A : B = 2 : 3 and B : C = 4 : 5. Find A : B : C.

Answers:

  1. 37.5%.
  2. 20%. 25 ÷ 125.
  3. 12.5%. SP = 800 × 1.25 × 0.9 = 900.
  4. ₹900. 5,000 × 6 × 3 ÷ 100.
  5. ₹2,100. 10,000 × 0.21.
  6. 6 days. 30 units; 3 + 2 a day.
  7. 20 m/s. 72 × 5/18.
  8. 72 km/h. 240 ÷ 12 = 20 m/s.
  9. 2 : 1 (₹40 rice to ₹55 rice). (55 − 45) : (45 − 40) = 10 : 5.
  10. 3 : 2. 72,000 : 48,000.
  11. 60. 6 × 45 − 5 × 42 = 270 − 210.
  12. 21. (7 × 6) ÷ 2.
  13. 1/6. Six outcomes out of 36.
  14. 616 cm². 22/7 × 196.
  15. 1,540 cm³. 22/7 × 49 × 10.
  16. 8 : 12 : 15.

If you get fewer than 13 right, go back to the full guide for each miss before your next mock.

Last-week checklist

  • Read this sheet once a day, covering the "Why" column.
  • One DI set of each type every day: table, bar or line, pie, caselet, missing data.
  • Ten simplification or approximation questions a day.
  • Redo the self-test on day 7; aim for 16 out of 16.
  • Go through your DI error log for repeated traps, and follow the quant plan for the order of topics.

A note on dates and numbers. Exam patterns, vacancies and schedules change from year to year. Always confirm the current details in the latest notification on the State Bank of India website .

Get the next SBI PO guide by email